{"id":33,"date":"2021-06-29T15:58:06","date_gmt":"2021-06-29T15:58:06","guid":{"rendered":"https:\/\/www.env.nm.gov\/construction-programs\/reports\/"},"modified":"2021-08-02T16:18:59","modified_gmt":"2021-08-02T16:18:59","slug":"reports","status":"publish","type":"page","link":"https:\/\/www.env.nm.gov\/construction-programs\/reports\/","title":{"rendered":"Reports"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><span style=\"font-family: helvetica, arial, sans-serif; color: #993300; font-size: 14pt;\">Infrastructure Development Report<\/span><\/h2>\n\n\n\n<p><span style=\"font-family: helvetica, arial, sans-serif; font-size: 12pt;\">The CPB staff works to ensure that projects are completed in a timely manner, are environmentally sound, are of high quality, and free of waste, fraud and abuse. The Infrastructure Development Report is produced annually to report on the oversight and management of projects throughout New Mexico.<\/span><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">SFY 2020 Infrastructure Development Report<\/span><\/h2>\n\n\n\n<p><a href=\"\/wp-content\/uploads\/sites\/3\/2019\/01\/2020-Final-Infrastructure-Development-Report.pdf\">2020 Final Infrastructure Development Report<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt; color: #993300;\"><strong>CPB Funding Programs\u2019 Annual Reports<\/strong><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\"><a href=\"\/wp-content\/uploads\/sites\/3\/2020\/10\/2020-NMED-CWSRF-Annual-Report.pdf\"><span style=\"font-size: 12pt;\">Clean Water State Revolving Loan Fund (CWSRF) Annual Report<\/span><\/a><\/span><\/li><li><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\"><a href=\"\/wp-content\/uploads\/sites\/3\/2017\/03\/RIP-ANNUAL-REPORT-FY-2020-signed.pdf\">RIP ANNUAL REPORT FY 2020 signed<\/a><\/span><\/li><li><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\"><span style=\"font-size: 12pt;\"><a href=\"\/wp-content\/uploads\/sites\/3\/2017\/03\/NMED-CPB-2020-Capital-Outlay-Annual-Report.pdf\">NMED CPB 2020 Capital Outlay Annual Report<\/a><\/span><\/span><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Infrastructure Development Report The CPB staff works to ensure that projects are completed in a timely manner, are environmentally sound, are of high quality, and free of waste, fraud and abuse. The Infrastructure Development Report is produced annually to report on the oversight and management of projects throughout New Mexico. SFY 2020 Infrastructure Development Report [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-33","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.env.nm.gov\/construction-programs\/wp-json\/wp\/v2\/pages\/33","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.env.nm.gov\/construction-programs\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.env.nm.gov\/construction-programs\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.env.nm.gov\/construction-programs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.env.nm.gov\/construction-programs\/wp-json\/wp\/v2\/comments?post=33"}],"version-history":[{"count":2,"href":"https:\/\/www.env.nm.gov\/construction-programs\/wp-json\/wp\/v2\/pages\/33\/revisions"}],"predecessor-version":[{"id":81,"href":"https:\/\/www.env.nm.gov\/construction-programs\/wp-json\/wp\/v2\/pages\/33\/revisions\/81"}],"wp:attachment":[{"href":"https:\/\/www.env.nm.gov\/construction-programs\/wp-json\/wp\/v2\/media?parent=33"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}