These Watershed-Based Plans (WBPs) were reviewed by EPA and determined to meet the nine planning elements described in the Nonpoint Source Program and Grants Guidelines for States and Territories.

 Completed PlanEPA Acceptance Letter
Comanche Creek Watershed Based Plan (2020)March 31, 2020
Rio Fernando de Taos Watershed Based Plan (2020)– Appendix A: Microbial Source Tracking Report– Appendix B: QAPP for Targeted Sampling– Appendix C: Sampling SOP– Appendix D: Field Sampling and Chain of Custody Form– Appendix E: QAPP for Microbial Source Tracking– Appendix F: BSLC Inputs and Results– Appendix G: BSLC Users ManualMarch 19th, 2020
Lower Rio Embudo Watershed Based Plan (2020)January 18th, 2020
Updated Upper Pecos WBP  (2019)December 11, 2012
Rio Puerco Watershed-Based PlanSupporting documents for the Rio Puerco WBPJanuary 18, 2018
2017 Cimarron Watershed Based Plan UpdateN/A
Black Canyon Riparian Restoration Plan Black Canyon Habitat Enhancement Basis of Design ReportBlack Canyon DrawingsMay 9, 2017
Lower Animas River Watershed Based PlanAugust 9, 2016
Mora River Watershed Based PlanAugust 9, 2016
Upper Rio San Antonio Watershed Based PlanMay 26, 2016
Rio Nutrias Watershed Based PlanJune 26, 2015
Paso del Norte Watershed Based PlanJune 26, 2014
Upper Gallinas Watershed Based PlanNational Forest Addendum (2018)2012
2012 Cimarron Watershed Based PlanJanuary 10, 2013
Rio Santa Barbara Watershed Based PlanOctober 27, 2010

Contact us

Ph: 505-827-0187 Find a list of Surface Water Quality staff contacts here.

Back to Top