New Mexico
Environment Department

Contact Information:
(505) 827-2855 MAIN // 1-800-219-6157 (toll free)
Environmental Emergencies:
505-827-9329 (24 hrs)

Hazardous Waste Bureau

WIPP – Permit Page

 

NMED WIPP Permit Page

The current Permit Parts and Attachments are available in MSWord and PDF.

Permit Table of Contents August 2019 
 Part 1 – General Permit Conditions – December 2018 
Part 2 – General Facility Conditions  March 2018
Part 3 – Container Storage – December 2018
Part 4 – Geologic Repository DisposalJuly 2019
Part 5 – Groundwater Detection Monitoring May 8, 2012
Part 6 – Closure Requirements December 2018
Part 7 – Post-closure Care Plan – September 2018
Part 8 – Corrective Action for SWMUs and AOCsNov 30, 2010

Attachments
A – General Facility Description and Process Information August 2019
A1 – Container Storage December 2018
A2 – Geologic Repository December 2018
A3 – Drawing Number 51-W-214-W, “Underground Facilities Typical Disposal Panel” – September 2018
A4 – Traffic Patterns August 2019
B – Hazardous Waste Permit Application Part AAugust 2019
C – Waste Analysis PlanDecember 2018
C1 – Waste Characterization Sampling MethodsMarch 13 , 2013
C2 – (Reserved) March 13 , 2013
C3 – Quality Assurance Objectives and Data Validation Techniques for Waste Characterization Sampling and Analytical Methods January 2016
C4 – TRU Mixed Waste Characterization Using Acceptable Knowledge September 2017
C5 – Quality Assurance Project Plan RequirementsMarch 13 , 2013
C6 – Audit and Surveillance ProgramMarch 2015
C7 – TRU Waste Confirmation – June 2018
D – RCRA Contingency PlanAugust 2019
E – Inspection Schedule, Process and Forms September 2018
F – Facility Personnel Permit Training Program – March 2018
G – Closure Plan – December 2018
G1 – Detailed Design Report for an Operation Phase Panel Closure System September 2018
G1-A – Technical Specifications, WIPP Panel Closure – September 2018
G1-B – DrawingsSeptember 2018
G2 – Shaft Sealing System Compliance Submittal Design Report September 2017
G2-A – Material SpecificationsNov 30, 2010
G2-B – Shaft Sealing Construction ProceduresNov 30, 2010
G2-E – Design DrawingsNov 30, 2010
G3 – Radiological Surveys to Indicate Potential Hazardous Waste Releases – Oct 2013
H – Post-Closure Plan – December 2018
H1 – Active Institutional ControlsDecember 2018
I – Compliance Schedule (Reserved)Nov 30, 2010
J – Hazardous Waste Management Unit TablesDecember 2018
K – Solid Waste Management Unit (SWMU) and Area of Concern (AOC) Tables –  Oct 2013
L – WIPP Groundwater Detection Monitoring Program Plan December 2017
M – Figures (Reserved) Nov 30, 2010
N – Confirmatory Volatile Organic Compound Monitoring Plan – August 2019 
O – Mine Ventilation Rate Monitoring Plan  – August 2019

 

Go to WIPP Page (including current WIPP News)