The current Permit Parts and Attachments are available in MSWord and PDF.
Permit Table of Contents – August 2020
Part 1 – General Permit Conditions – December 2018
Part 2 – General Facility Conditions – March 2018
Part 3 – Container Storage – December 2018
Part 4 – Geologic Repository Disposal –July 2019
Part 5 – Groundwater Detection Monitoring – May 8, 2012
Part 6 – Closure Requirements – December 2018
Part 7 – Post-closure Care Plan – September 2018
Part 8 – Corrective Action for SWMUs and AOCs – Nov 30, 2010
Attachments
A – General Facility Description and Process Information – August 2020
A1 – Container Storage – December 2018
A2 – Geologic Repository – August 2020
A3 – Drawing Number 51-W-214-W, “Underground Facilities Typical Disposal Panel” – September 2018
A4 – Traffic Patterns – May 2020
B – Hazardous Waste Permit Application Part A –August 2020
C – Waste Analysis Plan –December 2018
C1 – Waste Characterization Sampling Methods – March 13 , 2013
C2 – (Reserved) – March 13 , 2013
C3 – Quality Assurance Objectives and Data Validation Techniques for Waste Characterization Sampling and Analytical Methods – January 2016
C4 – TRU Mixed Waste Characterization Using Acceptable Knowledge – September 2017
C5 – Quality Assurance Project Plan Requirements – March 13 , 2013
C6 – Audit and Surveillance Program – March 2015
C7 – TRU Waste Confirmation – June 2018
D – RCRA Contingency Plan – August 2020
E – Inspection Schedule, Process and Forms – February 2020
F – Facility Personnel Permit Training Program – March 2018
G – Closure Plan – August 2020
G1 – Detailed Design Report for an Operation Phase Panel Closure System – September 2018
G1-A – Technical Specifications, WIPP Panel Closure – September 2018
G1-B – Drawings – September 2018
G2 – Shaft Sealing System Compliance Submittal Design Report – September 2017
G2-A – Material Specifications – Nov 30, 2010
G2-B – Shaft Sealing Construction Procedures – Nov 30, 2010
G2-E – Design Drawings – Nov 30, 2010
G3 – Radiological Surveys to Indicate Potential Hazardous Waste Releases – Oct 2013
H – Post-Closure Plan – December 2018
H1 – Active Institutional Controls – January 2020
I – Compliance Schedule (Reserved) – Nov 30, 2010
J – Hazardous Waste Management Unit Tables –December 2018
K – Solid Waste Management Unit (SWMU) and Area of Concern (AOC) Tables – August 2020
L – WIPP Groundwater Detection Monitoring Program Plan – January 2020
M – Figures (Reserved) – Nov 30, 2010
N – Confirmatory Volatile Organic Compound Monitoring Plan – August 2019
O – Mine Ventilation Rate Monitoring Plan – August 2019