Documents | Description & Instructions |
---|---|
GCP-3 Permit 9/12/06 | This is the GCP-3 Permit (current version) as issued on 9/12/2006. Please review the entire GCP-3 permit to determine whether your facility will qualify for this permit option prior to applying for a GCP-3 registration. Asphalt plants may elect to apply for a regular permit using the Universal Application Form. |
GCP-3 Multi-Form 12/1/24 | Use this GCP-3 Multi-Form application form for any of combination of the following: initial registration of a facility, facility relocations, substitution of equipment, & reporting of additional equipment. The form includes a change log that indicates the earliest version of the form still accepted. |
GCP-3, Rev 1 transition information letter | As of September 12, 2006, the new GCP-3 (revision 1) is in effect and supersedes the previous version. This letter described the transition process from the previous version to the current permit. |
GCP-3 Instructions | These GCP-3 Instructions provide information on siting requirements, filling out the application form, and public notice requirements. |
Compliance History Disclosure Form | In order for the Department to deem an air permit application administratively complete, or issue an air permit for those permits without an administrative completeness determination process, the applicant must complete this Compliance History Disclosure Form as specified in Subsection 74-2-7(P). An existing permit holder (permit issued prior to June 18, 2021) shall provide this Compliance History Disclosure Form to the Department upon request. |
Public Notice Template GCP-2, 3, & 5 permits | This template includes the minimum legal requirements for GCP Posted Public Notices. |
Relocating a Facility | Certain portable stationary sources can be relocated if all permit conditions are met. |
GCP-3 CO Emissions Calculation Tool | GCP-3 Carbon Monoxide (CO) Emissions Calculation Tool (Adobe Acrobat Format): Use this tool to aid in estimating Carbon Monoxide emissions. |
GCP-3 SO2 Spreadsheet | GCP-3 SO2 Spreadsheet: Use this spread sheet to aid in estimating sulfur dioxide emissions. |
Rolling Total Production Form | Production Record Form |
Instructions for Daily Record-keeping | Daily Record-keeping Instructions |
Instructions for Rolling Total Production Total | 12-month Rolling Production Total Instructions |
If you are not familiar with air quality permitting in New Mexico, we suggest a pre-application meeting with our staff prior to you putting effort into the application process. Use the Contact Us link to schedule a pre-application meeting.